• <wbr id="wyskk"></wbr><noframes id="wyskk"><tfoot id="wyskk"></tfoot>
  • <fieldset id="wyskk"></fieldset>
    <noframes id="wyskk">
  • <noscript id="wyskk"><dl id="wyskk"></dl></noscript>
    <tfoot id="wyskk"><button id="wyskk"></button></tfoot>
  • 您好,歡迎訪問濟(jì)南凱軒鵬宇玻璃有限公司 網(wǎng)站

    全國咨詢熱線:

    400-9968-996

    當(dāng)前位置:首頁>新聞資訊>公司新聞濟(jì)南辦公隔斷裝修適合哪些工程項(xiàng)目?

    濟(jì)南辦公隔斷裝修適合哪些工程項(xiàng)目?

    文章出處:http://www.traneyx.com.cn/ 人氣: 0 發(fā)表時(shí)間:2021-08-23
    裝修之前,要選擇辦公室玻璃隔斷裝修公司來規(guī)劃設(shè)計(jì)自己的辦公空間。在設(shè)計(jì)過程中,我們應(yīng)該考慮到辦公室裝修涉及的許多因素,因?yàn)檗k公室裝修項(xiàng)目是一個(gè)多元化的施工過程,涉及到辦公室裝修中許多常規(guī)的重要項(xiàng)目,不同的辦公室裝修項(xiàng)目往往在辦公室裝修中起著決定性的作用。在這里,幾種常見的濟(jì)南辦公隔斷裝修項(xiàng)目列舉如下:
    Before decoration, we should first choose the office glass partition decoration company to plan and design our own office space. In the design process, we should consider many factors involved in office decoration, because office decoration project is a diversified construction process, involving many conventional important projects in office decoration. Different office decoration projects often play a decisive role in office decoration. Here, several common office partition decoration projects in Jinan are listed as follows:
    一、消防工程
    1、 Fire engineering
    濟(jì)南辦公隔斷
    大部分辦公室裝修都要隔斷。如果隔斷到頂,需要換煙霧傳感器,物業(yè)公司一般會(huì)要求業(yè)主或者裝修公司自行,如果這樣的話就要找有那些有資質(zhì)的消防公司,消防公司按照規(guī)定還要報(bào)批當(dāng)?shù)叵谰诌M(jìn)行審批,這個(gè)時(shí)間通常要7~10天,另外在報(bào)批消防局是有一定費(fèi)用的。
    Most office decoration should be separated. If the partition reaches the top and the smoke sensor needs to be replaced, the property company will generally require the owner or decoration company to solve it by themselves. In this case, it is necessary to find those qualified fire companies. The fire companies also need to report to the local fire department for approval according to the regulations. This time usually takes 7 ~ 10 days. In addition, there is a certain fee in the report to the fire department for approval.
    二、留意空調(diào)
    2、 Pay attention to air conditioning
    同樣,辦公裝修中也需要?jiǎng)澐挚臻g,所以需要考慮每個(gè)空間都要預(yù)留一定數(shù)量的空調(diào)出風(fēng)口和回風(fēng)出風(fēng)口,所以也需要找有正規(guī)資質(zhì)的空調(diào)安裝公司。這里,基于空調(diào)的考慮,還涉及到我們的辦公室隔斷墻是否做到頂,比如德魯克隔斷公司近期完工的江蘇造紙廠的工程中,就是由于考慮到空調(diào),所以不能做到頂,不過,雖然隔斷墻沒有做到頂(按照消防要求,頂部空出300mm距離),不過,空出的部分可以做格柵處理,美觀時(shí)尚。
    Similarly, space division is also required in office decoration, so it is necessary to consider that a certain number of air conditioning outlets and return air outlets should be reserved in each space, so it is also necessary to find an air conditioning installation company with formal qualification. Here, based on the consideration of air conditioning, it also involves whether the partition wall of our office can be topped. For example, in the project of Jiangsu paper mill recently completed by Drucker partition company, it can not be topped because of the consideration of air conditioning. However, although the partition wall does not reach the top (300mm is left on the top according to the national fire control requirements), however, The spare part can be treated with grille, which is beautiful and fashionable.
    三、強(qiáng)弱電
    3、 Strong and weak current
    這是辦公隔斷墻裝修工程中的要點(diǎn),因?yàn)殛P(guān)系到整個(gè)公司的正常工作,不能忽視。由技術(shù)人員到現(xiàn)場(chǎng)進(jìn)行實(shí)際測(cè)量,把強(qiáng)弱電的預(yù)留開關(guān),插座以及各種線路走向全部體現(xiàn)規(guī)劃到圖紙上,然后交與物業(yè)公司審核。
    This is the key point in the office partition wall decoration project, because it is related to the normal work of the whole company and can not be ignored. Technicians shall go to the site for actual measurement, reflect the reserved switches, sockets and various line directions of strong and weak current on the drawings, and then submit them to the property management company for review.
    四、辦公家具
    4、 Office furniture
    因?yàn)榇蠖鄶?shù)辦公室都需要辦公室玻璃隔斷,很多線路,插座都要與隔斷相連接的,所以家具公司一定要與電器工程師有個(gè)機(jī)密的銜接,圖紙好要先由這兩方共同確定好。
    Because most offices need office glass partitions, and many lines and sockets must be connected with the partitions, the furniture company must have a confidential connection with the electrical engineer, and the drawings should be jointly determined by the two parties first.
    安裝辦公室玻璃隔斷時(shí),一定要注意每一個(gè)安裝細(xì)節(jié),確保安裝正確、準(zhǔn)確。同時(shí),由于使用的型材容易劃傷皮膚,操作時(shí)也要注意人身,避免劃傷或其他傷害。
    When installing the office glass partition, be sure to pay attention to each installation detail to ensure correct and accurate installation. At the same time, because the profile used is easy to scratch the skin, pay attention to personal safety during operation to avoid scratches or other injuries.

    資訊

    資訊文章

    ?
    亚洲国产日韩a在线播放,无码 人妻 在线视频污污网站,欧洲亚洲国产成人综合色婷婷,日本水蜜桃身体乳的美白效果 辽宁省| 千阳县| 霍邱县| 容城县| 兴隆县| 习水县| 叶城县| 伊宁县| 辽中县| 元阳县| 紫金县| 厦门市| 比如县| 西乡县| 修武县| 靖边县| 黄冈市| 收藏| 汕尾市| 乌海市| 融水| 潢川县| 南汇区| 二连浩特市| 格尔木市| 东明县| 怀柔区| 乐东| 隆尧县| 安岳县| 高州市| 罗山县| 土默特左旗| 上高县| 温州市| 莱阳市| 广西| 曲水县| 屯门区| 定西市| 潞西市|